Various Traffic Impacts Scheduled on I-71/75 Near Brent Spence Bridge

Sunday, July 13, 2025 at 6:17 PM

By Kentucky Transportation Cabinet, news release

Crews will be performing soil boring work ahead of the Brent Spence Bridge Corridor Project

(Covington, Ky.) - The Kentucky Transportation Cabinet (KYTC) advises motorists of upcoming traffic impacts for scheduled boring work along Interstates 71/75 in Kenton County beginning Monday, July 14. Crews will be collecting soil samples in various areas in anticipation of the Brent Spence Bridge Corridor Project.

Tentative Schedule of Work

  • Monday, July 14
    • I-71/75 northbound right lane closure between 188.3 and 190 mile points.
    • I-71/75 southbound left lane closure between 190.9 and 192 mile points
  • Tuesday, July 15
    • I-71/75 southbound right shoulder closure near the 189.8 mile point.
    • I-71/75 southbound exit off-ramp to Pike Street will be CLOSED between 9 p.m. and 5 a.m. (I-71/75 southbound collector/distributor: 191.08 to 190.96 mile points)
  • Wednesday, July 16
    • I-71/75 southbound right shoulder closure near the 189.8 mile point.
    • I-71/75 southbound exit off-ramp to Pike Street will be CLOSED between 9 p.m. and 5 a.m. (I-71/75 southbound collector/distributor: 191.08 to 190.96 mile points)
  • Thursday, July 17
    • I-71/75 southbound right shoulder closure near the 189.8 mile point.
    • I-71/75 southbound exit off-ramp to Pike Street will be CLOSED between 9 p.m. and 5 a.m. (I-71/75 southbound collector/distributor: 191.08 to 190.96 mile points)
  • Friday, July 18
    • I-71/75 southbound right shoulder closure near the 189.8 mile point.
    • I-71/75 southbound right shoulder closure on exit on-ramp from Pike Street (U.S. 25).
    • I-71/75 southbound exit off-ramp to Pike Street will be CLOSED between 9 p.m. and 5 a.m. (I-71/75 southbound collector/distributor: 191.08 to 190.96 mile points)

NOTE: for tentative schedule of work listed above -- motorists should expect lane/ramp closures between the evening/overnight hours of 9 p.m. and 5 a.m., and  the listed shoulder closures between 7 a.m. and 3 p.m. 

Message boards will be in place warning motorists of the upcoming lane/shoulder/ramp closures on I-71/75. Detour signage will be placed for the I-71/75 southbound Pike Street nightly exit ramp closure from Tuesday, July 15 through Friday, July 18.

DETOUR (from Ohio): I-71/75 southbound to Fifth Street (KY 8) exit. Turn left on to Fifth Street. Turn left on Main Street. Turn left on W. Fourth Street. Follow W. Fourth Street to the I-71/75 southbound ramp. Access to Pike Street (U.S. 25) and the Texas Turnaround will be maintained at all times.

Project schedules are subject to change due to inclement weather or other unforeseen circumstances

More from Local News

Events

Local News

Small Plane Crashes in Saluda Bottoms

Crash is under investigation

INDOT reminds Hoosiers to place campaign and other signs outside state right-of-way

Signs that have been removed will be taken to the nearest INDOT facility

Kentucky Governor To Relieve $250 Million in Medical Debt for More Than 130,000 Kentuckians

Governor signs executive order providing funding to Undue Medical Debt

Local Sports

Local Sports September 14-15, 2026

Any missing scores or to report a score email news@953wiki.com

Jennings County Baseball Coach Passes Away at 50

Visitation and funeral services will be held this week.

ORVC Weekly Report Summary (September 7 – 12) 2026

Congratulations to all the area athletes